Home ProductsExcavator Final Drive Parts

PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts

Certification
China Guangzhou Xinhuaxing Construction Machinery Co., Ltd. certification
China Guangzhou Xinhuaxing Construction Machinery Co., Ltd. certification
I'm Online Chat Now

PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts

PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts
PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts

Large Image :  PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts

Product Details:
Place of Origin: CHINA
Brand Name: LIZUAN
Model Number: PC200-7
Payment & Shipping Terms:
Minimum Order Quantity: 1PCS
Price: The price is negotiable
Packaging Details: Plastic film and box
Delivery Time: 1days
Payment Terms: L/C, D/A, D/P, T/T
Supply Ability: 1000

PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts

Description
Brand:: LIZUAN Condition:: Brand New
Category:: Construction Machinery Parts Delivery:: By Sea, Air, Express
Delivery Time:: Shipped In 2 Days After Payment Warranty:: 6 Month
High Light:

Gasket Copper Excavator Final Drive Parts

,

PC200-7 Excavator Final Drive Parts

,

PC200-7 Excavator Gear Shaw

LIZUAN PC200-7 Gasket Copper  Excavator Final Drive Parts Gear Shaw Construction Machinery Parts

 

Traveling star carrier gasket Torx gasket

 

Product Parameter:
Product Name: Excavator Final Drive Parts Gasket and Gear Shaw
Place of Origin: China (Mainland)
Model Number: PC200-7
Product Status: New
Material: Cast Iron
Application: Replacement
Delivery time: 3 days since getting the payment,not the customized item

 

 

1. Product precision

Precision is the key requirement for adjusting shims.Accurate adjustment for fuel quantity si completed depending

on grouping of products.We adopt high-precision optical ruler to control lapping dimension,and can control product

precision dimension within 0.002mm.We finish grouping by inspecting one product with two products inside

dust-free workshop.One product is measured for no less than 5 times from finishing process to finished product.

(Testing methods:use high-precision digital display micrometer to measure conformity between actual dimension

and required dimension,and whether the dimension for same-grouped products is same or not.)

 

2. Geometric tolerance

Geometric tolerance of adjusting shims is directly related to the maintenance quality of fuel injectors.Main

geometric tolerance requirement for adjusting shims is depth of parallelism.Large shim will affect product

tightness while small shim will affect reliability and stability of products.We adopt high-precision double-sided

lapping machine to ensure and control depth of parallelism for products within 0.002mm.Adoption of one-time

forming process better ensures product axiality.(Testing methods:use parallelism tester and deflection instrument

to test parallelism depth and axiality respectively)

 

PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts 0PC200-7 Gasket Copper Excavator Final Drive Parts Gear Shaw Construction Machinery Parts 1

 

 

 

FAQ:
common problem:
Q: What can you do
A: We can provide you with digging final drive and swing drive motors and reducer gearbox and their parts


Q: how long is the warranty period?
A: Within 6 months, we will provide you with maintenance spare parts within the warranty period free of charge.


Q: do you accept OEM or ODM?
A: Yes, you just need to provide your logo file or ideas.


Q: can I order one of our samples for testing first?
A: Of course!


Q: how do I order?
A: You need to tell us the model and quantity you are interested in, and then we will issue a proforma invoice for you. The goods will be prepared after receiving the payment. The preparation time depends on the content of the order


Q: do you have a factory?
A: Yes, we have our own factory and have 10 years of production experience in the excavated gear industry.

Contact Details
Guangzhou Xinhuaxing Construction Machinery Co., Ltd.

Contact Person: admin

Tel: +8618902252635

Send your inquiry directly to us (0 / 3000)